Always-on Usage

Copy library / What got built / Grok Bot

Seven Grok Bots run a week-long launch as a relay

Subscribe

What it does
The author's launch setup: one bot wakes on Monday morning and the other six have no schedule, each sleeping until the previous file lands and then passing the baton. A bad idea gets killed in writing before any code, and the money bot finds a domain under $40 and waits for a yes. The author says they closed the laptop on Monday and by Friday had a deck, a pull request and a domain on hold, with about 60 runs a week instead of 1,176 by their math. The prompt is in the replies.
Scenarios
Watch PRs / repos Calendar & meetings Code & ship
What the source covers
  • Author & original linkYes
  • What it doesYes
  • Verbatim source excerptYes
  • Screenshots / mediaYes
  • Steps / chaptersNot in source
  • Verbatim prompt / configNot in source
  • Results / numbersYes
  • Risk notesYes
  • Related entriesYes

— means the source doesn't say; we don't fill it in.

In the author's words
Elon Musk Grok Bot just built the most TERRIFYING launch machine on the internet...

[I closed my laptop on Monday. by Friday it had a deck, a pull request and a domain on hold]

/1 one bot wakes Monday morning. the other 6 have no clock at all

/2 each bot sleeps until the file before it lands, then passes the baton

/3 a bad idea gets killed in writing before a single line of code

/4 the money bot finds a domain under $40 and freezes until I say yes

/5 about 60 runs a week instead of 1,176, by my math

steal this prompt in the replies ↓
@gippp69 · · Open on X ↗

The author's post, quoted verbatim and left untranslated.

Screenshots
Video
Video thumbnail from the original post; click to watch it there
Prompt

The source does not include a prompt you can copy verbatim.

How to copy
  1. Read the source: x.com ↗
  2. Turn the steps/prompts from the source into one message for your Bot
  3. Run it manually once, then decide the frequency
Risks and limits
  • Involves payments, orders or bookings: let the bot draft first and act only after you confirm
  • Scheduled runs keep consuming usage: start at a low frequency and raise it once it is stable
  • The author's result may not reproduce for you; the original post is the reference
Usage estimate
Estimate with the metal calculator